VDCI Blog

Managing Building Information Models

Building Information Modeling (BIM) spans the entire concept-to-occupation timeline of a construction project. Managing these models effectively ensures seamless collaboration, efficiency, and accuracy from pre-design through facility management. A key player in this process is the BIM Manager, also referred to as a Virtual Design-to-Construction Project Manager (VDCPM), who oversees the integration and performance tracking of BIM across all project stages.

The Role of a BIM Manager

A BIM Manager acts as the central authority for coordinating BIM workflows, ensuring consistency in data management, and aligning digital models with project goals. Their responsibilities include:

  • Establishing BIM standards and protocols

  • Coordinating multidisciplinary teams

  • Managing model updates and revisions

  • Ensuring compliance with industry regulations and best practices

By maintaining control over the BIM environment, the BIM Manager helps optimize efficiency, reduce errors, and improve project outcomes.

Levels of Detail (LOD) in BIM

BIM models can be developed at different Levels of Detail (LOD), depending on the project phase and intended use. These include:

Learn BIM

  • Nationally accredited
  • Create your own portfolio
  • Free student software
  • Learn at your convenience
  • Authorized Autodesk training center

Learn More
  • LOD 100: Conceptual design with basic massing and general information

  • LOD 200: Preliminary design with approximate geometry and placeholder data

  • LOD 300: Detailed design with precise dimensions and specifications

  • LOD 400: Fabrication-level details for manufacturing and construction

  • LOD 500: As-built conditions for facility management

Determining the appropriate LOD ensures that the right level of information is available at each stage, preventing unnecessary modeling efforts and optimizing resource use.

Ensuring BIM Model Accuracy and Integration

To maintain data integrity, BIM models must be regularly updated and reviewed. This involves:

  • Conducting clash detection to identify and resolve conflicts

  • Linking models with schedules (4D BIM) and cost estimation (5D BIM)

  • Utilizing cloud-based platforms for real-time collaboration

A well-managed BIM process enhances decision-making, reduces project risks, and ensures a smoother transition from design to construction and operations.

Conclusion

Effectively managing Building Information Models is crucial to maximizing the benefits of BIM. With a skilled BIM Manager in place and a structured approach to model development, AEC professionals can achieve greater accuracy, efficiency, and project success.

Learn more in these courses

Back to Blog
Yelp Facebook LinkedIn YouTube Twitter Instagram